Toll milling means paying another operator to process ore at its existing plant instead of building your own. For a restarting mine, it can lower upfront capital and shorten the path to production. It is the processing model at the centre of Regency Silver’s plan to bring Jabalí back into production.
Mining and processing are two different jobs
Mining takes rock out of the ground. Processing recovers the gold from it, usually through crushing, grinding and a recovery method such as cyanide leaching, as the US EPA’s gold-processing reference describes. Toll milling simply changes who does the processing: the mine delivers ore, and the mill operator treats it for a fee.
Why use someone else’s mill?
Building a processing plant is one of the largest costs in starting a mine and can take years. Using an existing facility nearby can:
- reduce the capital needed before production begins
- shorten the time to first gold
- let the mining company focus on safely mining and delivering ore
The trade-off is a processing fee and haulage costs, which is why a good toll-milling partner is close by and well matched to the ore.
What makes a good toll-milling fit?
The ore suits the plant. Gold recovery depends on the ore’s mineralogy and the plant’s process, so metallurgical test work is key. At Jabalí, test work by a previous operator in 2021 found that samples responded well to cyanide leaching.
The terms work for both sides. A toll-milling agreement sets out how much ore the plant will accept, over what period, how gold content is measured and how payment is settled.
Responsibilities are clear. Water, waste and environmental management remain important whoever runs the plant, as international guidelines such as the World Bank Group’s mining EHS guidelines set out.
How does toll milling fit Regency’s plan for Jabalí?
In our September 2026 acquisition announcement, we set out our plan to return Jabalí to production and enter a toll-milling arrangement with a nearby mine. Jabalí sits in the Mulatos Mining District, an active gold district, which makes this model a natural fit. Studies are underway to estimate restart capital and operating costs, and securing the toll-milling agreement is a key milestone in the acquisition.
Read about our plan for Jabalí and follow our next milestones.
Project and technical information is drawn from Regency Silver’s September 9, 2026 acquisition news release. That release states that its scientific and technical information was reviewed and approved by Mike Tucker, P.Geo., a Regency director and Qualified Person under NI 43-101. This attribution refers to the news release, not a separate review of this article.
The 2021 metallurgical test work described above was performed by a previous operator on test samples; it is not a guarantee of future operating recovery. La Dura is not currently in production. The announced acquisition remains subject to its disclosed conditions, and a restart depends on technical work, financing, applicable approvals and a toll-milling agreement.
Forward-looking information: This article contains forward-looking statements, including statements about Regency Silver’s exploration plans at Dios Padre, the Jabalí acquisition and the planned return to production at Jabalí. These statements are based on current expectations, and actual results may differ. Please read the cautionary language in our news releases.